From: route@monster.com
Sent: Tuesday, April 12, 2016 11:30 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: GIS Drafter
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
OBJECTIVE: |
Over 25 years of diverse project
experience involving both office and field assignments in the field of Civil
Engineering, Land Surveying, Planning, GIS, Environmental Engineering,
Structural Engineering, and Geotechnical Engineering. |
|
EXPERIENCE: |
11/2012 - 6/2014 |
Charter Communications, Inc. |
|
|
|
|||
|
• In order to maximize sales of
Charter Communication’s High Speed Internet, Long Distance Phone and
Television service, Solicited customers through door-to door sales, events
and scheduled appointments. • Successfully generated a 5% sales goal out of
500 potential customers on a monthly basis.• Ensured customer satisfaction by
nurturing relationships with prospects and existing customers. |
|||
|
1/2012 - 6/2012 |
AECOM |
||
|
|
|||
|
• Produced presentation drawings,
plan/profile drawings and cross sections for the construction of a Combined
Sewer Overflow (CSO) project with an estimated construction cost of over $1.2
billion and consisting of a 9 foot diameter overflown tunnel over a mile
long. Using Civil 3D, ARC GIS and Microstation, assisted CSO Program
Management team with existing base mapping, and proposed design layouts.•
Created and coordinated Civil 3D CAD standards as well as engineering and
surveying standards for Combined Sewer Overflow Program Management Team and
the City of Akron Engineering Bureau. |
|||
|
7/2011 - 12/2011 |
AECOM |
||
|
|
|||
|
• Assisted managers in
coordinating the CAD design standardization of CIVIL 3D. Standards were used
to insure congruency between 8 separate design teams working on a $171
million drainage design project with construction estimates over $10 Billion.
• Researched existing, as-built and proposed utility systems for a city with
a population approaching 5 million. This was done using Sharepoint to view
and open thousands of CAD files, GIS files, PDF files and various other
documents using Civil 3d, Microstation ARC GIS and Microsoft programs.• Using
Civil 3D, ARC GIS and Microstation, assisted with the development of survey
base maps, proposed engineering layouts and bid documents. Tendered bid
packages consisted of plan/profiles, quantities, details and cross sections
for 12 large scale drainage systems. Each system consisted of up to 6 10’X10’
drainage pipes, large scale detention areas, 300 foot wide open drainage
channels and ocean bottom outlet structures. |
|||
|
10/1998 - 6/2011 |
AECOM |
||
|
|
|||
|
• Designed state of the art Field
to Finish Design System. Responsible for programing, beta testing, deployment
and training for over 70 CAD users throughout the AECOM Midwest Region. •
Presented with award of appreciation from the National Park Service for Outstanding
Spirit of Partnership in design and construction of Alger County Road H-58, a
new 26 mile roadway along the Pictured Rocks National Lakeshore in Alger
County, Michigan. Responsible for all aspects of survey and design including
preliminary route design for survey teams to gather data along, production of
existing basemaps and final design layout. Assisted in the production of bid
documents including plan/profile sheets, construction details, estimated
quantities and cross sections. I was also responsible for providing all
construction layout information.• Over the course of 14 years, I was lead
designer on projects including highway design, site design, municipal sewer
and water design, harbor design, wetland and water way control design among many
other types of civil engineering and environmental projects. |
|||
|
10/1995 - 10/1998 |
AECOM |
||
|
|
|||
|
• As CAD/Survey Technician for the
survey department I was involved in many types of surveys including waterway
bathymetry, wetland mitigation, flood control dikes and dams, rail roads,
land fill cell monitoring and construction, mine tailing dikes, underground
utilities, ALTA surveys, boundary survey, plating, condominiums and mortgage
reports. • In this roll I was also responsible for gathering legal research,
writing legal descriptions, conducting staking and |
|||
|
5/1993 - 10/1995 |
U.P. Engineers and Architects |
Ishpeming, mi |
|
|
|
|||
|
• As CAD designer I was involved
in many types of surveys including wetland mitigation, underground utilities,
ALTA surveys, boundary surveys, plating, condominiums and mortgage reports. •
Performing as a survey technician I conducted all types of surveys including
cadastral surveys, construction surveys, environmental survey and as-builts.
I was also responsible for construction monitoring and inspection. |
|||
|
5/1991 - 5/1993 |
McGhie and Betts, Inc. |
||
|
|
|||
|
• As an engineering technician I
was responsible for all aspects of soil and material testing. Also acted as
construction monitor and inspector.• As a survey technician I performed field
operations for plats, boundary surveys, construction survey and staking,
environmental surveys, utility surveys, as-built surveys and flood control
surveys. |
|||
|
9/1986 - 5/1991 |
Various Private and Goverment Jobs
1986-1991 |
||
|
|
|||
|
My Work Experience also includes
College Internships and Coop Employment as an Engineering/Survey Technician
and as a CAD/GIS Technician with the following companies and government
agencies from 1986 to 1991.GIS CAD Technician College Intern Sept. 1990 to Apr.
1991 City of Rochester – Rochester, MN Survey/Engineer Aide College Intern
May 1990 to Sept. 1990 McGhie & Betts Inc. - Rochester, MN GIS CAD
Operator College Intern Sept. 1989 to May 1990 City of Rochester - Rochester,
MN Survey/Engineer Aide College Intern May 1989 to Sept. 1989 Yaggy/Colby
Associates - Rochester, MN GIS CAD Operator College Intern Sept. 1988 to May
1989 Olmsted County - Rochester, MN Survey/Engineer Aide College InternApr.
1988 to Sept 1988 McGhie & Betts Inc. - Rochester, MNDraftsman/Survey
Aide Vocational InternSept. 1986 to Aug. 1987McGhie & Betts Inc. -
Rochester, |
|||
|
EDUCATION: |
9/1988 - 5/1991 |
Rochester Community And Technical
College |
|
|
|
|||
|
Attended RCC to gain
Pre-Engineering and Civil Engineering Technology Digree |
|||
|
8/1987 - 5/1988 |
Finlandia University |
||
|
|
|||
|
Attended Finlandia University to
obtain AA in Pre-Engineering |
|||
John Marshall High School
(Minnesota) |
|||
|
|
|||
|
LANGUAGES: |
Languages |
Proficiency Level |
English |
Fluent |
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||